Description: Using the map of the existing documentation as a base, the existing relevant gaps need to be identified. Applying the prioritization criteria defined in the communication strategy in terms of thematic areas and audiences, these gaps need to be prioritized and a first draft list of priority documents for 2014 need to be produced. In parallel, a list of priority translations should also be produced.
This task will most likely be performed by AGT, MR & TH.]]>
Author: atalavan
Comment: The documentation gap analysis by the Secretariat has been finished with the common work from AH, OB, MR & AGT, The result has been reflected together with the documentation analysis by audience segment, but also as an summary document: http://www.gbif.org/resources/5705.
Created: 2014-08-25 10:31:18.863